Full catalogue
Catalogue · 004

Electrical and automation

Engine room and bridge electrics: from generator brushes to complete alarm panels and navigation equipment. New parts plus equivalents for systems whose makers have left the market.

A photo of the nameplate or the board is enough for a quote - we also identify older automation systems and propose functionally matching replacements, with documentation for class acceptance where the installation requires it.

Request a quoteQuote in 24 h · no obligations

Items in this section

Selected parts from this section. The full catalogue is available with a filter.

Marine UPS
04 · Electrical and automation

Marine UPS

Price on request5-15 working days
Pressure transmitter
04 · Electrical and automation

Pressure transmitter

Price on request5-15 working days
Marine thermometer
04 · Electrical and automation

Marine thermometer

Price on request5-15 working days
Programmable starter unit
04 · Electrical and automation

Programmable starter unit

Price on request5-15 working days
Tank level gauge
04 · Electrical and automation

Tank level gauge

Price on request5-15 working days
Float level gauge
04 · Electrical and automation

Float level gauge

Price on request5-15 working days
Float level controller
04 · Electrical and automation

Float level controller

Price on request5-15 working days
Generator set
04 · Electrical and automation

Generator set

Price on request10-25 working days
Circuit breaker
04 · Electrical and automation

Circuit breaker

Price on request5-15 working days

Typical items

  • Generators and spares: brushes, AVRs, bearings
  • Starters and contactors
  • Pressure, temperature and level sensors
  • Engine room alarm panels and systems
  • Navigation electronics and GMDSS comms
  • Marine and navigation lighting
  • Certified marine cables
  • Starter and emergency batteries

Documents and certificates

Type certificates for navigation and GMDSS equipment, declarations of conformity, marine cable certificates. For automation replacements - a comparison spec for acceptance.

Availability and lead times

Sensors, brushes and small automation from stock. Navigation electronics and larger assemblies 5-15 working days.