MAN B&W 6K45GFCA piston rod seals and scraper rings - photo
Engine and propulsion · 001

MAN B&W 6K45GFCA piston rod seals and scraper rings

Piston rod stuffing box seal set, oil scraper rings, sealing lip and O-rings for the MAN B&W K45GFCA, plus loose sealing rings made to size. The stuffing box keeps the scavenge space apart from the crankcase, so worn rings soon show up as dirty system oil.

Compatibility

MAN B&W 6K45GFCA

Technical data

Application
piston rod stuffing box
Condition
Genuine or approved equivalent
Lead time
5-15 working days
Documentation
confirmed in the quote

Part numbers

  • Piston rod seal (set)90205-22
  • Oil scraper ring90505-15-0982
  • Oil scraper ring90505-15-1872
  • Sealing lip90505-15-7034
  • O-ring90301-22-0542
  • Sealing ring 190.5 × 4.5 mm
  • Sealing ring 190.5 × 6.7 mm
  • Sealing ring 47.2 × 5.5 mm
1

Quote in 24 h · no commitment

We match the reference number and equivalent to your vessel.

Documentation

We settle the document scope at quotation - from a maker certificate to class survey, depending on the item and what the vessel requires. It is confirmed before the part ships.

Availability and lead time

Fast-wearing items for common engine types ship from the Warsaw warehouse in 24-48 h. The rest comes from approved makers, typically 5-15 working days.

Related items

Fuel injection plunger
01 · Engine and propulsion

Fuel injection plunger

Precision plunger-and-barrel element for the fuel pump, lapped as a matched pair and nitrided to resist scuffing on heavy fuel.

Price on request5-15 working days
Crankpin bolt
01 · Engine and propulsion

Crankpin bolt

Forged connecting-rod big-end bolt with rolled thread and controlled torque, for high fatigue-cycle joints.

Price on request5-15 working days
Auxiliary engine crankshaft
01 · Engine and propulsion

Auxiliary engine crankshaft

Crankshaft for the genset, journals reground and NDT-checked, supplied ready to fit with matched bearings.

Price on request10-25 working days
Auxiliary engine frame assembly
01 · Engine and propulsion

Auxiliary engine frame assembly

Complete auxiliary engine frame with main bearing saddles, machined and checked for main-bore alignment.

Price on request10-25 working days